ME GATE 2009 - Online Test

Q1. What are the upper and lower limits of the shaft represented by 60 f8
Use the following data: 
Diameter 60 lies in the diameter step of 50 -80mm. 
Fundamental tolerance unit, 
i = in μm = 0.45D1/3 + 0.001D, where D is the representative size in mm; 
Tolerance value for IT8 = 25i. Fundaental deviation for ‘f’ shaft = -5.5D0.41  
Answer : Option A
Explaination / Solution:
No Explaination.


Q2. A 20o full depth involute spur pinion of 4 mm module and 21 teeth is to transmit 15 kw at 960 rpm. Its face width is 25 mm
The tangential force transmitted (in N ) is 
Answer : Option A
Explaination / Solution:
No Explaination.


Q3. A 20o full depth involute spur pinion of 4 mm module and 21 teeth is to transmit 15 kw at 960 rpm. Its face width is 25 mm
The tangential force transmitted (in N ) is 
Given that the tooth geometry factor is 0.32 and the combined effect of dynamic load and allied factors intensifying the stress is 1.5; the minimum allowable stress (in MPa) for the gear material is
Answer : Option B
Explaination / Solution:
No Explaination.


Q4. The expected time (te) of a PERT activity in terms of optimistic time (to), pessimistic time (tp) and most likely time (tl)is given by 
Answer : Option A
Explaination / Solution:
No Explaination.


Q5. A company uses 2555 units of an item annually. Delivery lead time is 8 days. The recorder point (in number of units) to achieve optimum inventory is
Answer : Option C
Explaination / Solution:
No Explaination.


Q6. Six jobs arrived in a sequence as given below: 

Average flow time (in days) for the above jobs using Shortest Processing Time rule is
Answer : Option A
Explaination / Solution:
No Explaination.


Q7. Consider the following PERT network:

The optimistic time, most likely time and pessimistic time of all the activities are given in the table below. 

The critical path duration of the network (in days) is
Answer : Option D
Explaination / Solution:
No Explaination.


Q8. Consider the following PERT network:

The optimistic time, most likely time and pessimistic time of all the activities are given in the table below. 
The standard deviation of the critical path is
Answer : Option B
Explaination / Solution:
No Explaination.


Q9. For a matrix  the transpose of the matrix is equal to the inverse of the matrix [M]T = [M]-1. The value of x is given by
Answer : Option A
Explaination / Solution:
No Explaination.


Q10. The divergence of the vector field   at a point (1,1,1) is equal to
Answer : Option C
Explaination / Solution:
No Explaination.