Q1. A linear relationship is observed between speed and density on a certain section of a highway. The free flow is speed is observed to be 80 km per hour and the jam density is estimated as 100 vehicles per km length. Based on the above relationship, the maximum flow expected on this section and the speed at the maximum flow will respected be
Answer : Option D
Explaination / Solution:
No Explaination.


Q2. The focal length of the object glass of a tacheometer is 200 mm, the distance between the vertical axis of the tacheometer and the optical centre of the object glass is 100 mm and the spacing between the upper and lower line of the diagram axis is 4 mm. With the line of collimation perfectly horizontal, the staff intercepts are 1 m (top), 2m (middle), and 3 m (bottom). The horizontal distance (m) between the staff and the instrument station is
Answer : Option A
Explaination / Solution:
No Explaination.


Q3. A road is provided with a horizontal circular curve having deflection angle of 55o and centre line radius of 250 m. A transition curve is to be provided at each end of the circular curve of such a length that the rate of gain of radial acceleration is 0.3 m/s3 at a speed of 50 km per hour. Length of the transition curve required at each of the ends is
Answer : Option C
Explaination / Solution:
No Explaination.


Q4. A light house of 120 m height is just visible above the horizon from a ship. The correct distance (m) between the ship and the light house considering combined correction for curvature and refraction, is
Answer : Option D
Explaination / Solution:
No Explaination.


Q5. A horizontal curvature curve with a centre line radius of 200 m is provided on a 2-lane, 2-way SH section. The width of the 2-lane road is 7.0 m. Design speed for this section is 80 km per hour. The brake reaction time is 2.4 s, and the coefficients of friction in longitudinal and lateral directions are 0.355 and 0.15, respectively. The safe stopping sight distance on the section is
Answer : Option C
Explaination / Solution:
No Explaination.


Q6. A horizontal curvature curve with a centre line radius of 200 m is provided on a 2-lane, 2-way SH section. The width of the 2-lane road is 7.0 m. Design speed for this section is 80 km per hour. The brake reaction time is 2.4 s, and the coefficients of friction in longitudinal and lateral directions are 0.355 and 0.15, respectively. The set-back distance from the centre line of the inner lane is
Answer : Option C
Explaination / Solution:
No Explaination.


Q7. Two primary air pollutants are
Answer : Option C
Explaination / Solution:
No Explaination.


Q8. Match List-I (Estimation method) with List-II (Corresponding indicator) and select the correct answer using the codes given below the lists :
List-I                                                                                                             List-II
a. Azide modified Winkler method for dissolved oxygen                             1. Eriochrome Black T 
b. Dichromate method for chemical oxygen demand                                  2. Ferroin 
c. EDTA titrimetric method for hardness                                                      3. Potassium chromate 
d. Mohr or Argentometric method for chlorides                                           4. Starch 
Codes:
Answer : Option B
Explaination / Solution:
No Explaination.


Q9. A weir on a permeable foundation with downstream sheet pile is shown in the figure below. The exit gradient as per Khosla’s method is

Answer : Option C
Explaination / Solution:
No Explaination.


Q10. Group symbols assigned to silty sand and clayey sand are respectively
Answer : Option C
Explaination / Solution:
No Explaination.